- Link to Preliminary design report
- See also Chapter 3 and Appendix B of the project report for pilot studies at the Ohio test site, as well as drawings, capital cost estimates, and footprint estimates for high rate installations at this study site.
- See also Appendix B of the project report for discussion of preliminary design and cost estimates for improvements to SFBW equalization at this facility.
|