EE&T
|
Water Research Foundation
Home
> DensaDeg System Drawings and Equalization Info
Introduction/Background
Project Description
High Rate System Options
Case Studies
Cost/Footprint Estimating Tool
Equalization
Glossary
Acknowledgements
Please select a system drawing from the following options:
(Provided by Infilco Degremont, September 2007)
160 gpm (0.2 MGD) System Drawing
785 gpm (1 MGD) System Drawing
2,000 gpm (3 MGD) System Drawing
3,000 gpm (4 MGD) System Drawing
5,100 gpm (7 MGD) System Drawing